Earn $2,750+ for a 10-Day Turnaround Phase 1 Environmental Site Assessment Washington
Licensed Environmental Professionals in Washington: Find 1099 Phase I ESA Washington jobs and freelance environmental consultant assignments with fast payouts. Secure steady environmental due diligence work.
Apply as an Environmental Professional
- 10 Day Turnaround
- 1099 NEC Contractor
- ASTM E1527-21
- W-9 Direct Deposit
Washington EPs · 1099-NEC
Washington Has the Demand — We Bring the Projects
Kent (166 sessions), Moses Lake (17 sessions), and regulator impressions for Washington Ecology indicate strong demand in Washington. We need Environmental Professionals to cover this state.
- Active commercial real estate pipeline across Washington, WA — industrial, multifamily, retail, and office Phase I ESAs.
- Underserved local EP coverage means fast dispatch on WA ASTM E1527-21 assignments near you.
- Adjacent submarkets generate steady overflow Phase I ESA demand from lenders, SBA borrowers, and CRE buyers.
- Refinance, acquisition, and 1031-exchange activity keeps Washington Phase I ESA volume consistent year-round.
About Washington
There are 23,691 facilities regulated by the EPA recorded in Washington. A total of 11,692 facilities in Washington are identified as RCRA hazardous waste handlers. Washington state records show 21,019 RCRA hazardous waste facilities on file. Washington has 69 sites on the EPA Superfund National Priorities List. Twenty-two NPL sites in Washington have been cleaned up and delisted. Currently, there are no NPL sites in Washington with a final status.
Why Washington EPs Choose Fast Phase I
Built by environmental professionals, for environmental professionals.
Get Paid Quickly
Direct deposit on every completed project. Transparent per-project pay, W-9 / 1099-NEC — no chasing invoices, no net-60 games.
Work On Your Schedule
Accept the Washington projects you want, when you want. Supplement a full-time role or build a full book of business — you're in control.
Steady Local Opportunities
Set your home ZIP and a travel radius of 150 to 750 miles. Projects in your home state always reach you, and you'll hear about new Phase I ESA opportunities the moment they're posted in your coverage area.
Supported By An Experienced Platform
Join a nationwide network of environmental professionals backed by platform E&O coverage, dispatch, scheduling, and QA tooling — so you can focus on the field work you do best.
How Washington EPs Get Started
Create your EP profile
Tell us your experience level, licensure, and upload credentials. Verification typically completes within one business day.
Set your Washington coverage area
Choose a travel radius of 150 to 750 miles from your home ZIP. Projects in your home state always reach you, and you can add states where you'll write reports while a Field EP does the site visit.
Accept the projects you want
Review the property, scope, and payout — accept only what fits your schedule.
Site walk, draft, get paid
Perform the ASTM E1527-21 site visit and submit your draft through our field tools. A licensed PE/PG reviews and finalizes. Payout via Stripe Connect Express (direct deposit to your bank) — funds arrive three days after the report is delivered to the client.
Ready to earn as a Washington EP?
How the platform works for EPs.
How do I get paid?
Payouts run through Stripe Connect Express — direct deposit to your bank account. Funds arrive three days after the report is delivered to the client. We handle 1099-NEC reporting automatically at year end. No invoicing, no chasing clients.
How much do I make per project?
Your EP Professional Fee starts at $1,690 on the $2,750 base project. Add-ons (additional parcels, 5+ acres, pre-1980 improvements, primary type surcharge, extra reliance parties) all flow directly to you — not to the platform.
What tools do I get?
Field tools built specifically for Phase I ESA work: SiteSnap360™ for guided site photos, SnapMap™ for figures, Project Folder™ for organized deliverables, and SnapRelay™ for client messaging. You also get access to our platform assistant — a focused helper built around Phase I ESA workflows that keeps you on task while you work through each section. You write and sign the report.
Do I need to be licensed?
We accept Environmental Professionals at every experience level as EPs, and Field EPs who handle the site visit, photograph log, and site figures. Every report is reviewed and signed by a state-licensed PE/PG before it goes to the client.
How do I set my coverage area?
In your EP dashboard, set a travel radius of 150 to 750 miles around your home ZIP. Projects in your home state (from your mailing address) always reach you, and you can add states where you'll write reports while a Field EP does the site visit. You can adjust anytime.
What's the turnaround expectation?
Site visit within a few days of accepting the project, then draft submitted so the report can be delivered 10 days after the site visit. Rush projects are optional — you see turnaround and net payout before you accept.
Is E&O coverage included?
Yes — Fast Phase I carries Errors & Omissions coverage for the platform and every EP working through it. It's built into every Phase I ESA and costs you nothing.
How are projects dispatched to me?
When a client orders a Phase I ESA inside your coverage area, we send you the project with scope, address, and net payout up front. You accept or pass. No bidding, no cold outreach, no business development.